Start withone line andone metric.

The fastest way to evaluate Duromex is a scoped pilot on the line that hurts most, with a success metric written down before anything is instrumented.

1
business day to reply
14 d
minimum baseline window
1
written success metric
0
SDRs between you and an engineer

Tell us which line hurts

The more specific you are about the failure you want to remove, the more useful the first call will be.

  • We reply within one business day.
  • The first call is with a process engineer, not an SDR.
  • Every pilot starts with a written success metric.

No newsletter. No resale of your data. Recipe and quality IP never leaves your tenant.

Who you will talk to

Pick the conversation that matches where you are.

Design partner

You have a line, a metric and appetite to work with a pre-launch company. Commercial terms reflect that risk.

Paid pilot

You want a scoped, time-boxed evaluation on one line with a written success metric and a defined exit.

Enterprise evaluation

Multi-plant scope, security review, procurement and a rollout plan across sites.

Technology partner

You build equipment, MES or integration services and want to work together. See partners.

From first message to first baseline

Five steps, typically six to eight weeks to a measured baseline.

You write to us

One paragraph about the line and the failure. Detail beats formality.

Engineer call

Thirty to sixty minutes with a process engineer to test whether the wedge is real.

Scoping

We agree the line, the workflow, the metric and the measurement method in writing.

Instrumentation

Edge runtime and connectors installed; nothing writes to equipment.

Baseline

Fourteen days minimum of shadow mode, then we publish the baseline and the accuracy gap to you.

What to bring to the first call

None of this is mandatory, but it makes the call far more productive.

The line
Which line, what product family, what takt time and what shift pattern
The failure
What goes wrong, how often, and where it is currently detected
The cost
Roughly what a unit of that failure costs — scrap, rework hours, downgrade or warranty
The data
What telemetry already exists from presses, enamel lines, foamers, tools, testers and MES
The owner
Who inside your plant would own the success metric
The constraint
Anything about safety, IT/OT policy or downtime windows we must design around

Where a pilot usually starts

Most pilots begin at the stage where failures are discovered — leak and functional test — then extend upstream to the stage that caused them.

Form & stampWeld & seamEnamel & paintFoam & insulateWire & assembleLeak & function testRate & pack
PASS · A+++ 1 2 3 4 5 6 7

What we will tell you on the first call

If your problem is better solved by a fixed-function vision system, we will say so. If your line has no usable telemetry and no appetite to add sensors, we will say that too.

Duromex is pre-launch. Working with us means working alongside a team still hardening the product. That is a real trade-off, and the commercial terms reflect it.

We will be clear about

  • Whether your wedge is a good fit or not
  • What we have and have not yet proven in production
  • Where the model will be uncertain on your product mix
  • What the pilot needs from your team, in hours
  • What happens to your data, in writing

Is a pilot the right next step?

A quick self-check before you write to us.

SignalGood fitNot yet
VolumeContinuous line, hundreds of units per shiftLow-volume or job-shop production
Failure costWarranty, scrap or downgrade cost is materialLosses are already close to zero
TelemetryEquipment emits data, or sensors can be addedNo telemetry and no appetite to add any
OwnershipA named person owns the metricNo internal owner for the outcome
AppetiteComfortable starting in shadow modeRequires proven control from day one

What we commit to

1

business day response

0

data resold or shared

100%

pilots with a written metric

14 d

minimum honest baseline

What partners say after the first call

“Our end-of-line functional testers told us what failed. They never told us which press stroke or foam shot caused it. That link is the whole product.”

Plant Director
Refrigeration OEM · design partner Illustrative

“Foam voids are invisible until the energy rating comes back wrong. Predicting density distribution before the cabinet cures is the part I could not buy anywhere else.”

Process Engineer
Cabinet line · design partner Illustrative

“If it writes to the press, it needs an audit trail a quality auditor accepts. Duromex started there instead of bolting it on.”

Quality & Test Engineer
Laundry OEM · design partner Illustrative

Practical questions

How long does a pilot take?

Typically six to eight weeks to a measured baseline, then a further period in advisory mode before any control is discussed.

What does a pilot cost?

Pilot pricing is scoped to the line and the workflow. See pricing for the subscription model that follows a successful pilot.

Do you sign NDAs?

Yes, as a matter of course. Design-partner work is under NDA and nothing publishes without written approval.

Can we start with a security review?

Yes — many enterprises do. Start at security and we will work through your questionnaire.

Tell us which line hurts most.

One paragraph is enough to start. A process engineer will reply.

Duromex is pre-launch. Figures shown are design-partner targets and modelled economics, not audited results. Ask us for the methodology.